Skip to main content

ET26SWG0001 - GAHP Design Tool Phase 1

Active
Project Name
GAHP Design Tool Phase 1
Project Number
ET26SWG0001
Funding Entity
SWG
Market Sector
Residential & Commercial & Industrial
TPM Category Priority 1
Water Heating
Project Description

The goal of Phase 1 of this project is to develop a tool that provides integration guidelines for emerging gas-fired commercial heat pump water heaters (CHPWH) and baseline equipment (standard & high-efficiency, tankless & storage-type) to ensure:
- Ideal system configuration and component sizing, optimizing capital/installed costs.
- Optimized system efficiency for a given installation type and climate zone (gas-fired CHPWH + baseline equipment).
- Reliable energy and operating cost savings, and insight into control strategies to achieve the same.